Proper installation of Insulation Dome Caps is crucial for achieving optimal performance and ensuring insulation effectiveness. The following are detailed installation steps and precautions:

Preparation before installation:

Cleaning work: Thoroughly clean the dust, debris, and oil stains on the surface of the insulation layer to ensure that the surface is clean, dry, and flat.

Tool preparation: Prepare the necessary installation tools such as screwdrivers, wrenches, sealant guns, etc., and ensure that the tools are in good condition and suitable for use.

Check the dome caps: Before installation, carefully inspect the Insulation Dome Caps for any damage, deformation, or missing components.

Installation steps:

Positioning: Determine the installation position of the dome cap according to design requirements or actual needs, and mark it properly.

Selection of fixing method: Choose the appropriate fixing method based on the type of dome cap and installation environment. Common fixing methods include screw fixation, buckle fixation, or adhesive fixation.


Screw fixation: Use screws to fix the dome cap on the insulation layer, paying attention to the moderate tightening of the screws to avoid damage to the insulation layer or deformation of the dome cap caused by over tightening.

3d542040e52de79

Buckle fixation: Align the buckle of the dome cap with the corresponding position, gently press it to firmly lock it in place.

Adhesive fixation: Apply an appropriate amount of specialized adhesive on the adhesive surface of the dome cap, then stick it onto the insulation layer and press for a period of time to ensure a firm adhesion.

Sealing treatment: If the dome cap has sealing components such as sealing strips or rings, ensure that they are installed in place to achieve a good sealing effect. If additional sealant is required, it should be applied evenly and continuously to avoid gaps.

Inspection and adjustment: After installation, carefully check whether the installation position of the dome cap is correct, whether it is firmly fixed, and whether the seal is good. If there are any issues, make timely adjustments and corrections.

Precautions after installation:

Waiting for curing: If glue or sealant is used, it is necessary to wait for sufficient curing time according to the product instructions to ensure bonding strength and sealing performance.

Avoid collision: During the installation period, avoid colliding or applying excessive external force to the dome cap to avoid affecting its installation effect.

Regular inspection: It is recommended to regularly inspect the installed Insulation Dome Caps for looseness, damage, or seal failure, and promptly perform maintenance and replacement.